FAA – EMERGENCY GENERATOR PROJECTS

FAA – EMERGENCY GENERATOR PROJECTS

Location: Multiple Locations

Design Start/Completion: 2002 – 2010

Size & Technology: High Reliability Electrical Systems

Firm Role: Engineering Design

Waldron served as the Engineer for a series of emergency/standby generator upgrades and/or replacements at radar sites across the United States for the Federal Aviation Administration. A typical project included an engine generator, automatic transfer switch, load bank, HVAC upgrades and a fuel tank/pump system.