Skip To Content

Waldron Engineering And Construction

Close

BiogenIdec

BiogenIdec a world leader in research and development of cancer treatment drugs required a solution for the high price and poor reliability of utility service at their Cambridge Massachusetts campus.

The solution came in the form of a new central energy plant to serve six buildings with electricity and five with high pressure steam. The engineering design included: a dual fuel Solar Taurus 60 turbine/generator, a 50,000 #/hr gas fired heat recovery steam boiler with an SCR and CO catalyst, two 50,000 lb/hr package boilers, condensate receiver, deaerator, water treatment system, CEM system, a new electrical distribution system with switchgear, new steam distribution system and control systems.